How to select samples

1. Risk tab

  • Check that risk assessments appear in the Control Risk section for the sample testing areas: benefit payments, contributions and loans. An all-white grid means SOC 1 assessments have not been pulled into the plan. Add the relevant SOC 1 assessments on the SOC 1 tab if needed.

  • Click the arrows in each risk area to see the risk assessment details.

2. Response to Risk tab

  1. Use the drop-down to view an area with sample testing, such as Contribution and Participant Accounts.

  2. Check that steps have populated in the Attributes Tested Electronically and Attributes Tested by SOC 1 Auditor columns.

  3. Click the sample size button. It creates the sample using a statistical sample size (hypergeometric distribution with a probability of error between 5% and 10%, or the coverage rate method).

    • If the distributions or loans sample size comes in as 0, check Variables. The distribution and loan calculations need counts, which don't always import properly.

  4. Check that a number appears in the Final Sample Size column. Click the refresh button if needed.

  5. Click the generate sample selections button. Only click this once you know the risk is correct.

  6. View the selections on the Sample Selection tab. If you need to change them afterwards, see "How to change an existing sample" below.

How to change an existing sample

Option 1: Manually change the final sample selection

  1. Go to the Sample Selection tab.

  2. Select the testing area tab: Contributions, Benefit Payments, Loans or Initial Audit.

  3. If the participant you want is already in the list:

    • Double-click the participant's row.

    • Check or uncheck the box in the Sample column for each audit step as needed. Participants added manually show a double asterisk (**).

    • Repeat for other participants.

    • At the top left, select Update to save or Cancel to discard.

  4. If the participant isn't in the list, add them first:

    • In the Participant Name column, click the Add Participant icon.

    • Check the box to the left of each participant to add.

    • Click Add at the top right of the pop-up.

    • Click Confirm.

  5. Required to populate the testing view: click Run at the top of each column where you changed selections, then in the pop-up click Pre-Calculate – AS_XX_XX to update the Sample Testing view with the new selections.

Option 2: Generate a completely new final sample selection

  1. Go to the Sample Selection tab.

  2. Select the testing area tab: Contributions, Benefit Payments, Loans or Initial Audit.

  3. Click Run at the top of the column for the audit step.

  4. In the pop-up, click Reselect.

  5. Required to populate the testing view: click Run at the top of each changed column, then click Pre-Calculate – AS_XX_XX.

How to manually add sample selections from Data Intelligence

Certain Data Intelligence (DI) steps let you add (not replace) participants or transactions to sample selections you've already generated.

Data Intelligence steps

Sample testing step

DI-7, DI-8

CO-03

DI-11, DI-12, DI-13, DI-14, DI-15, DI-16, DI-17, DI-18, DI-19

BP-01

DI-20, DI-21, DI-22, DI-23, DI-24, DI-25, DI-26

LO-01

Specific requirements

  • Type Sample in the Results column of the Data Intelligence Audit Step Script Results file.

  • The system can only read tabs with names it recognizes. If you renamed a tab so a step rerun wouldn't overwrite it, change the name back before using this feature.

Steps

  1. After generating the initial sample selections, go to the Sample Selection tab.

  2. Click the add DI samples button at the top right of the tab.

  3. A green pop-up confirms the DI samples were added. Participants added this way show a single asterisk (*).

  4. To populate the Sample Testing view, click Run at the top of each changed column, then click Pre-Calculate – AS_XX_XX.

Frequently asked questions

I updated the sample selection, Relevant Plan Provisions and/or data, but the Sample Testing view doesn't show the updates.

Push the updated information into the Sample Testing view:

  1. Go to the Sample Selection tab.

  2. Select the testing area tab: Contributions, Benefit Payments, Loans or Initial Audit.

  3. Click Run at the top of each changed column.

  4. In the pop-up, click Pre-Calculate – AS_XX_XX.


Source: AI Knowledge Repository / Resources (currently in Whatfix) v5-28-26 / Guides and Troubleshooting / Sample Selection Guide.pdf (version 3.4.2026). Screenshots in the source PDF are not included.